We were honoured to win the contract to work in the new Cork Airport Terminal. Our project scope was to install Close Control Units specific for operation with the computer rooms at the airport. These units were specified as there was a need for high sensible cooling and close control of temperature and humidity.

Because of the need for close control 24 hours a day, 365 days a year, a newly developed inverter compressor was incorporated into the outdoor unit, maximizing the energy efficiency of the units. In addition to these high spec units a large number of split units were installed in Switch rooms. Each room had a pair of identical units installed to provide run and standby at all times.